Road Construction: 2008

Map
Reference
(see below)

Location of Construction

Construction Activity

Road Closure

Duration

Information

1

2nd Avenue East/ County Road 5 from 3rd St A West to Jubilee bridge 160 Metres

Full road and service reconstruction

detour
Yes! Detour Provided, Local and Emergency Vehicles Only

June to September 2008 

Limited access will be available during weekends and evenings. See map for detour routes

4th St West from 2nd Avenue East to 2nd Avenue West (300 Metres)

Full road and service reconstruction

detour
Yes! Detour provided, Local and Emergency Vehicles Only

June to September 2008 

Limited access will be available during weekends and evenings.See map for detour routes

2

2nd Ave E From 3rd St "A" West to Harrison Park entrance.

Watermain service replacement

No!   Lane closures only

June to September 2008 

Traffic control persons on site when activities dictate

3

10th Street West from 1st Ave West to 3rd Avenue West

Traffic signal upgrade including poles, Asphalt replacement and road improvements

No!   Single lane closures only. One lane in each direction

Ongoing!     Through June and July and September

Information notices will be delivered to affected property owners prior to repaving 10th St West 

4

7th Ave E  between 8th Street "A" East and 9th Street East

Road and Retaining Wall reconstruction

detour
Yes! Detour provided Local and Emergency Vehicles Only

September to December

See map for detour routes

5

11th St "A" W From 6th Ave W easterly 80 Metres to end of street.

Watermain replacement

No!    Local and Emergency Vehicles Only

Fall 2008

Additional information will be provided later.

6

Various locations throughout the City

Concrete Curb and Sidwalk replacement  Annual Program

Lane closures with Traffic control persons Temporary traffic delays possible

July and September

Annual capital program to replace defective concrete specific to broken Curbs and Sidewalks. Locations not listed on map 

Approved 2008 Annual Resurfacing Locations

 

2008 Approved Resurfacing Locations

From

To

Length  in Metres

 

A

1st Ave W

12th St W

14th St W

179

 

All Asphalt Grinding and 

Paving operations will be 

completed during August 

and September at all these 

locations

 

 

 

 

B

14th St W

1st Ave W

2nd Ave W

176

C

14th St W

Alpha St

Westerly

71

D

4th Ave W

5th St W

7th St W

358

E

4th Ave W

14th St W

16th St W

286

F

4th Ave E

13th St E

14th St E

133

G

7th Ave E

4th St E

5th St E

325

H

5th Ave 'A' W

15th St W

16th St W

245

I

3rd Ave W

17th St W

18th St W

150

J

6th Ave E

17th St E

18th St E

208

K

12th St E

3rd Ave E

4th Ave E

80

 

L

3rd Ave 'A' E

11th St E

Southerly

70

 

M

2nd Ave E

13th St E

17th St E

415

 

N

17th St E

2nd Ave E

Harbour wall

400

 

 

 
 
 
 